Officer Decisions

Officers exercise delegated decision making powers in respect of both non-executive and executive functions of the Council.

The present Scheme of Delegation from the Leader of the Council, which sets out how executive functions will be discharged, provides for delegated decision making by officers. Appendix 9 of the Constitution sets out the non-executive functions delegated to officers. All executive functions, other than those reserved by Cabinet, may be discharged by officers.

The Chief Executive and Strategic Directors of the Council have established their own sub-schemes of delegation detailing which and how both non-executive and executive functions will be discharged on behalf of the authority.

Decision records for the discharge of functions by officers are published below. These decision records set out the following information:-

Use the below search options at the bottom of the page to find information regarding recent decisions that have been taken by Council officers.

Officer Decisions

02/11/2026 - Replacement Contract for Enforcement & Debt Collection Services ref: 2245    Recommendations Approved

The Service Director, Financial Services grants approval to sign and enter into a new contract for the Council’s Enforcement & Debt Collection Services.

Decision Maker: Executive Director of Corporate Services

Decision published: 10/11/2026

Effective from: 02/11/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

2nd November 2026

Title:

Replacement Contract for the Council’s Enforcement & Debt Collection services.

 

Decision Maker:

(Including Job Title)

Judith Badger

Section 151 Officer

Executive Director Corporate Services

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

The Executive Director Corporate Services has delegated functions, as set out within the Council’s Constitution, Responsibility for Functions (Appendix 9), section 4C5 – 3.

 

Decision:

The Executive Director Corporate Services grants approval to award contracts for the Council’s Enforcement & Debt Collection services to CDER Group Ltd and Jacobs.

Reasons for the Decision:

The Council’s existing framework call-off contract for its Enforcement & Debt Collection services is due to expire on 30 November 2026, with no further options to extend.  A replacement contractual arrangement is therefore required to ensure the continued delivery of critical debt recovery functions supporting the Council’s commitment to collect outstanding Council Tax, Non-Domestic Rates, Housing Benefit Overpayments and Sundry Debts.

 

Details of alternative options considered and rejected:

As part of the procurement business case various routes to market were considered and this was deemed to be the best approach for the council.

 

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

None

Dispensations Granted:

(If any)

None

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None

Dispensations Granted:

(If any)

None

Reports or parts of reports considered

Procurement Business Case

 

 

I certify that this is a true record of the executive decision to:

 

The Strategic Director of Finance and Customer Services  grants approval to procure a new contract for the Council’s Enforcement & Debt collection services

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

 

Dated:          2nd November 2026

 

Name:          Judith Badger                              

Job Title:     Executive Director Corporate Services, S151 Officer

 

 

 

Wards affected: (All Wards);

Lead officer: Adrian Blaycock, Steven Ward


23/10/2026 - Acquisition of land and property interests related to Rotherham Gateway ref: 2244    Recommendations Approved

To exercise the delegations given at Cabinet in September 2023 and July 2025 to negotiate the acquisition by agreement of property interests related to Rotherham Gateway within the available funding.

 

Decision Maker: Executive Director of Regeneration and Environment

Decision published: 09/11/2026

Effective from: 23/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

23rd October, 2026

 

Title:

Acquisition of land and property interests related to Rotherham Gateway

Decision Maker:

(Including Job Title)

Simon Moss, Service Director of Planning, Regeneration and Transport and Kevin Fisher, Service Director of Property and Facilities Services

 

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

18 September 2023 Cabinet Meeting Minutes

Resolved: That Cabinet:

  1. Authorised the Assistant Director of Planning, Regeneration and Transport to negotiate the acquisition by agreement of the property interests in Appendix 1 Appendix 2 and Appendix 3 and within the available funding, in consultation with the Council’s S.151 Officer, Assistant Director, Legal Services, the Cabinet Member for Jobs and the Local Economy, and the Cabinet Member for Transport and Environment.

Minute 58 refers.

7 July 2025 Cabinet Meeting Minutes

Resolved: That Cabinet:

  1. Authorise the Assistant Director of Property and Facilities Services to agree the acquisition of properties in exempt Appendix 2 in consultation with the Council’s Section 151 Officer, Strategic Director for Regeneration & Environment, Cabinet Member for Transport, Jobs & the Local Economy and the Cabinet Member for Finance and Community Safety.

Minute 33 refers.

Decision:

Exercise the delegation to agree and negotiate the acquisition by agreement of land and property interests related to Rotherham Gateway.

 

1.    To exercise the delegation approved by Cabinet on 18 September 2023 to the Service Director of Planning, Regeneration and Transport and the Service Director for Property and Facilities Services to negotiate and agree the acquisition by agreement, and within the available funding, of the property interests identified in the exempt appendices, in consultation with the Council’s Section 151 Officer, Service Director for Legal Services and the relevant Cabinet Members.

2.    To exercise the delegation approved by Cabinet on 7 July 2025 to the Service Director for Property and Facilities Services to agree the acquisition of property interests required to support the Rotherham Gateway masterplan, in consultation with the Council’s Section 151 Officer, Executive Director for Regeneration and Environment, Cabinet Member for Transport, Jobs and the Local Economy and Cabinet Member for Finance and Community Safety.

 

Reasons for the Decision:

The Council is working with partners to promote the development of the Station Quarter at Rotherham Gateway. The acquisition would secure land required to support delivery of the Station Quarter together with adjoining property interests located within the wider Rotherham Gateway masterplan area. It would provide the Council with control of a strategically important and contiguous landholding, reduce future land-assembly and programme risk, and provide flexibility for the delivery of later phases of the Gateway programme.

 

The decision is needed:

1.    To approve the acquisition of the freehold property interests identified in the exempt appendices on the terms set out in the Heads of Terms and Acquisition Report, subject to completion of the required legal, financial, taxation and property due diligence and confirmation that the total cost remains within the approved financial limit.

2.    To note that the acquisition will use all, or the substantial majority, of the currently available Rotherham Gateway land-acquisition budget and may leave insufficient existing funding to acquire the remaining site identified in the September 2023 and July 2025 Cabinet reports.

3.    To note that replacement external funding is being pursued to replenish the Gateway land-acquisition budget, but if that funding is not approved, is delayed or is insufficient, a further report to Cabinet may be required to seek an additional allocation or approval of a revised funding and acquisition strategy for the remaining sites.

4.    To authorise the Service Director for Property and Facilities Services, in consultation with the Section 151 Officer and Service Director for Legal Services, to approve any final property, lease, access-road, separation-works and indemnity-insurance matters necessary to complete the acquisition, provided that these do not increase the total commitment above the approved financial limit or materially alter the basis on which the acquisition has been approved.

5.    To require Property and Facilities Services the to establish appropriate post-completion arrangements for management of the property and lease, including rent collection, insurance, landlord compliance, management of common infrastructure, lease-event monitoring and

Property and Facilities Services to exercise the landlord’s break provisions following service request from the RIDO project team.

 

Details of alternative options considered and rejected:

Option 1 - Do nothing.

A ‘do nothing’ option would result in the continued fragmented ownership of the land required to deliver the Rotherham Gateway. Without securing control of these land interests, the Council would be forced to negotiate later or rely on compulsory purchase powers to assemble the land necessary to bring forward the Station Quarter, which would add time and risk to the programme.

This option is not recommended.

 

Option 2: Seek to acquire only the land immediately required for the Station Quarter

The Council could seek to acquire only the land presently identified as being required for the Station Quarter. However, the sellers have indicated that they wish to dispose of their interests as a single package. A partial acquisition is therefore unlikely to be available on acceptable terms and would not secure the wider landholding identified within the Gateway masterplan. It would also leave the Council exposed to fragmented ownership, further negotiations and potentially higher future land-assembly costs.

This option is not recommended.

 

Option 3: Acquire the complete property interests in accordance with the Heads of Terms

This option would secure the complete freehold interests identified in exempt Appendix 2 on the terms set out in the Heads of Terms at exempt Appendix 4. It would provide the Council with control of land required for the Station Quarter together with adjoining property interests situated within the wider Gateway masterplan area.

 

The Council’s appointed RICS Registered Valuer has assessed the negotiated terms and has concluded that the negotiated consideration is below the valuer’s opinion of the value of the property interests. The acquisition report also identifies that the negotiated transaction is materially below the estimated cost that could arise through a future compulsory acquisition process.

 

The replacement occupational lease would provide rental income while preserving the Council’s ability to secure vacant possession through a landlord-only break option from the fifth anniversary. The new lease will also be contracted out of the security of tenure protections in the Landlord and Tenant Act 1954, reducing the potential compensation exposure associated with obtaining future vacant possession.

 

This option would use all, or the substantial majority, of the existing Gateway land-acquisition budget and may require replacement funding or a future Cabinet allocation to complete the remaining land acquisitions. On balance, the strategic land-assembly benefits, independently supported valuation and future flexibility are considered to outweigh that risk.

 

This option is recommended.

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

None

Dispensations Granted:

(If any)

None

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None

Dispensations Granted:

(If any)

None

Reports or parts of reports relevant to the decision being taken:

 

The report of the Service Director of Planning, Regeneration and Transport: EXEMPT Acquisition of Land and Property Interests at Forge Way in Connection with Rotherham Gateway

 

 

I certify that this is a true record of the executive decision to:

 

Exercise the delegation to agree and negotiate the acquisition by agreement of land and property interests related to Rotherham Gateway

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

 

Signed by the Decision Maker:

 

A white paper with a black text AI-generated content may be incorrect.

 

 

 

 

Dated:          23rd October 2026

 

Name:          Simon Moss                    

Job Title:     Service Director, Regeneration & Environment

 

Name:          Kevin fisher                     

Job Title:     Service Director, Property & Facilities Services

 

Wards affected: (All Wards);

Lead officer: Maria Coyne


27/10/2026 - Extension of Contract 19-163 - Rotherham Sexual Health Services - All Ages ref: 2243    Recommendations Approved

To extend the Rotherham Sexual Health contract for 12 months as permitted in the contract terms from 1st April 2027-31st March 2028.

 

Decision Maker: Executive Director of Adult Care, Housing and Public Health

Decision published: 05/11/2026

Effective from: 27/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

27 October 2026

 

Title:

Extension of Contract 19-163 – Rotherham Sexual

Health Services – All Ages

 

Decision Maker:

(Including Job Title)

Emily Parry-Harries, Director of Public Health

Details of Specific Delegation

 

Under Section 4C3 of Appendix 9 of the Constitution, the Executive Director of Adult Care, Housing and Public Health is authorised to discharge executive functions through the commissioning and provision of social services for adults and public health services for the whole population and delivery of housing for the Borough, including: -

3. Public Health

(a) Commissioning and Quality;

(b) Health Improvement;

(c) Health Intelligence; and

(d) Health Protection

 

Under Appendix 9 of the Constitution – Sub-Scheme of Delegation (page 25) the Director of Public Health is authorised to:

15. Public Health

(a) Ensure the council meets its duties to improve public health;

(b) Ensure the delivery of public health protections and health improvement responsibilities;

c) Ensure the council plans and responds to emergencies that present a risk to public health; and

(d) Ensure the council meets other local government public health responsibilities.

 

Decision:

To extend the Rotherham Sexual Health contract to The Rotherham NHS Foundation Trust (TRFT) for 12 months as permitted in the contract terms.

 

Reasons for the Decision:

The decision is made in order to extend the sexual health contract, for 12 months from 1st April 2027 until 31st March 2028, implementing the required Consumer Price Index (CPI) uplift in line with the contractual terms and conditions.

 

The services delivered by TRFT through the contract are for health care services that fall within the procurement regime established by the Health Care Services (Provider Selection Regime) Regulations 2023 (PSR Regulations) that came into effect on 1st January 2024.

 

Although this decision is made after the 1st of January 2024, the Officer has been advised that the saving transitional arrangements set out in Regulation 29(3) of the PSR Regulations will apply to it and that they are satisfied. It follows that although the contract has been called off under a framework agreement made under the Public Contract Regulations 2015 (as amended), it is valid under the Health Care Services (Provider Selection Regime) Regulations 2023.

 

Details of alternative options considered and rejected:

Option 1 - recommended: To extend the contract for

one year, implementing the required CPI uplift and a

new Social Value commitment. The provider is

performing well and the contract allows the permitted

contract extension period.

 

Option 2 – not recommended: To extend the contract

for the full extension period of 5 years, with annual

reviews of the required CPI uplift and a new Social

Value commitment. The provider has confirmed a

preference for a one-year extension at this time, whilst

a financial review of the contract is

undertaken by TRFT.

 

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

None

Dispensations Granted:

(If any)

None

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None

Dispensations Granted:

(If any)

None

Reports or parts of reports considered

Officer Decision Report - Extension of Contract 19-163

–      Rotherham Sexual Health Services – All Ages

 

 

I certify that this is a true record of the executive decision to:

Extend the Rotherham Sexual Health contract to The Rotherham NHS Foundation Trust for 12 months from 1st April 2027 until 31st March 2028 as permitted in the contract terms.

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

 

Dated:          27/10/2026

 

Name:          Emily Parry-Harries                    

Job Title:    Director of Public Health

 

 

 

 

Wards affected: (All Wards);

Lead officer: Jennifer Armitage


27/10/2026 - Hurley Croft Community Centre - Decision to remove Community Facility Charge ref: 2242    Recommendations Approved

Approval to remove the Community Facility Charge payable by affected tenants at Hurley Croft following the approved closure and conversion of the former neighbourhood centre into residential accommodation.

 

The Community Facility Charge will cease from the date the building is closed and no longer available for residents' use, which is anticipated to coincide with the contractor taking possession of the site to commence the approved conversion works, in accordance with the Housing Delivery Programme proposals for Hurley Croft.

 

Decision Maker: Executive Director of Adult Care, Housing and Public Health

Decision published: 04/11/2026

Effective from: 27/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

27 October 2026

Title:

Hurley Croft Community Centre – Removal of Community Facility Charge

Decision Maker:

(Including Job Title)

Sarah Clyde, Service Director – Housing

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

This decision is made under the delegated authority approved by Cabinet through the Housing Delivery Programme Report (July 2026), considered by Cabinet on 6 July 2026 (Minute 28).

 

Cabinet resolved:

"To delegate authority to the Service Director of Housing, in consultation with the Cabinet Member for Housing, to remove the service charge at Hurley Croft once work to convert to residential accommodation is ready to start."

 

The report confirmed that the existing Community Facility Charge would need to be removed once a deliverable project was in place and works to convert the former Hurley Croft Neighbourhood Centre to residential accommodation were ready to commence.

 

Decision:

To remove the Community Facility Charge payable by affected tenants at Hurley Croft with effect from the date the building is closed and no longer available for residents' use, which coincides with the commencement of the approved conversion works.

Reasons for the Decision:

The former Hurley Croft Neighbourhood Centre is being converted into residential accommodation as part of the Council's approved Housing Delivery Programme. Cabinet previously approved the inclusion of the scheme within the programme and subsequently delegated authority to the Service Director of Housing, in consultation with the Cabinet Member for Housing, to remove the Community Facility Charge when conversion works were ready to commence.

 

The facility will no longer be available for residents' use once the contractor takes possession of the site and conversion works commence. It is therefore appropriate to remove the Community Facility Charge from the same date.

Removal of the charge reflects the fact that the facility is no longer being provided and ensures that affected tenants are not charged for a service which is no longer available.

 

Details of alternative options considered and rejected:

Option 1: Remove the Community Facility Charge from the date the building closes and conversion works commence (Recommended).

This option aligns the removal of the charge with the withdrawal of the facility and is consistent with the authority delegated by Cabinet.

Option 2: Delay the removal of the Community Facility Charge until a later date.

This option was rejected because residents would continue to be charged after the facility had ceased to be available for their use.

Option 3: Retain the Community Facility Charge permanently.

This option was rejected because the neighbourhood centre is no longer operational and the charge would no longer relate to a service being provided.

 

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

None declared

Dispensations Granted:

(If any)

N/A

 

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None declared

Dispensations Granted:

(If any)

N/A

 

Reports or parts of reports considered

Cabinet Report: Annual Housing Development Report 2022/23 (Cabinet 11 July 2022). REPORT TEMPLATE FOR CABINET & COMMISSIONER

Cabinet Report: Housing Delivery Programme 2024/25 Update (Cabinet 29 July 2024). https://moderngov.rotherham.gov.uk/documents/s147230/Report%20-%20Housing%20Delivery%20Programme.pdf

Cabinet Report: Housing Delivery Programme Report 2025-26 Update (Cabinet 7 July 2025), including Recommendation 3 and paragraph 2.14 approving the inclusion of Hurley Croft within the Housing Delivery Programme. REPORT TEMPLATE FOR CABINET & COMMISSIONER

Cabinet Report: Housing Delivery Programme Report - January 2026 and Cabinet Minute 105 confirming delegated authority arrangements. REPORT TEMPLATE FOR CABINET & COMMISSIONER

Cabinet Report: Council Homes Housing Delivery Programme Update - 6 July 2026 Cabinet Minute 28, including Recommendation 4 delegating authority to remove the service charge at Hurley Croft. (Public Pack)Agenda Document for Cabinet, 06/07/2026 10:00

 

I certify that this is a true record of the executive decision to:

 

Remove the Community Facility Charge payable by affected tenants at Hurley Croft from the date the neighbourhood centre closes and is no longer available for residents' use.

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

Dated:          27/10/2026

 

Name:          Sarah Clyde                      

Job Title:     Service Director – Housing

 

If you require any assistance in the completion of the decision record please contact the Governance Team governance@rotherham.gov.uk

 

Wards affected: Hoober;

Lead officer: Uzma Sattar


27/10/2026 - Purchase of fifteen new homes at the former Miners Welfare, Maltby under the Small Sites Homebuilder Initiative ref: 2241    Recommendations Approved

Approval to enter into contract with Massive Investments Ltd and Massive Regeneration Ltd to purchase fifteen new homes at former Miners Welfare, Maltby.

Decision Maker: Executive Director of Adult Care, Housing and Public Health

Decision published: 04/11/2026

Effective from: 27/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

27th October, 2026

Title:

Purchase of fifteen new homes at the former Miners Welfare, Maltby under the Small Sites Homebuilder Initiative.

Decision Maker:

(Including Job Title)

Sarah Clyde

Service Director of Housing

 

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

Enaction of resolution 2 of the Council Homes Housing Delivery Programme – July 2026 Update approved at Cabinet July 2026.

 

2.      Approves the programme changes outlined in this report to facilitate the delivery of 1,000 new Council homes by Summer 2027, within the financial resources allocated to the programme from the Housing Revenue Account (HRA).

 

Cabinet Meeting Minutes Monday 06-Jul-2026 – Minute 28 refers.

 

and further to approval of the Full Business Case – Former Miners Welfare, Maltby (SME Initiative) approved 4th August 2026 in consultation with the Cabinet Member for Housing.

 

Decision:

Approval to enter into contract with Massive Investments Ltd and Massive Regeneration Ltd to purchase fifteen new homes at former Miners Welfare, Maltby.

 

Identified as Appendix 2 – 6th July 2026 Cabinet report.

 

The Council will purchase:

·       Fifteen no. three-bedroom house

 

The homes are scheduled to be handed over by June 2027 and will be brought into the Council’s existing housing stock and made available to applicants from the Housing Register.

 

Reasons for the Decision:

The decision has been taken in-line with the Cabinet approval, to ensure that the Council can continue to deliver new council homes to meet residents’ needs.

 

The financial detail of the acquisitions is set out within the capital business case. It is not included within the decision record on the basis that it is commercially sensitive. This is in-line with the over-arching Cabinet report exemption.

Details of alternative options considered and rejected:

Previous Housing Delivery Programme reports have considered the alternative option not to pursue new acquisition opportunities and this was not recommended because the Council needs to ensure a continuous pipeline to deliver the Council homes needed.

 

 

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

None declared

Dispensations Granted:

(If any)

None declared

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None declared

Dispensations Granted:

(If any)

N/A

Reports or parts of reports considered

Report of the Strategic Director of Adult Care, Housing and Public Health – Council Homes Housing Delivery Programme – July 2026 Update.

 

Full Business Case (FBC) – Former Miners Welfare, Maltby (SME Initiative), authorised by Sarah Clyde, Service Director of Housing

 

 

I certify that this is a true record of the executive decision to:

 

Enter into contract with Massive Investments Ltd and Massive Regeneration Ltd to purchase fifteen new homes at former Miners Welfare, Maltby. 

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

Dated:          27/10/2026

 

Name:          Sarah Clyde           

Job Title:     Service Director of Housing

 

 

If you require any assistance in the completion of the decision record, please contact the Governance Team governance@rotherham.gov.uk

 

Wards affected: Maltby East;

Lead officer: Lindsey Castle


23/10/2026 - Household Waste Recycling Centre (HWRC) - Opening Hours ref: 2240    Recommendations Approved

To approve the implementation of standardised Household Waste Recycling Centre (HWRC) opening hours options of 09:30 to 17:00 throughout the entire year, removing the current seasonal variations. This change will ensure consistency of service delivery and alignment with council policies and operational requirements.

 

The change replaces the previous winter (6 hour) and summer (8.5 hour) schedules with a balanced and equitable year-round model.

 

More consistent and stable working hours support improved staff retention, recruitment, and operational planning.

 

A uniform 09:30 opening time (currently 10:00) provides better access for residents during periods of highest demand, thereby enhancing the overall customer experience and efficiency of the service.

 

Decision Maker: Executive Director of Regeneration and Environment

Decision published: 27/10/2026

Effective from: 23/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

23rd October 2026

Title:

Household Waste Recycling Centre (HWRC) - Opening Hours

Decision Maker:

(Including Job Title)

Sue Procter – Interim Service Director, Community Safety & Street Scene

 

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

 

As per the Regeneration and Environment sub-scheme of delegation, the Executive Director is authorised as follows:

 

Sub-Scheme of Delegation - Executive Director of Regeneration and Environment.pdf Page 7

 

 

7.       Other functions

 

Any function not otherwise reserved to the full Council, the Cabinet, a committee of the Cabinet, a member of the Cabinet, a joint committee discharging executive functions or another local authority, relevant to the Service Director’s portfolio.

 

 

Appendix 9 Responsibility for Functions.pdf

 

SECTION 4C6:

EXECUTIVE DIRECTOR OF REGENERATION AND

ENVIRONMENT – DELEGATED EXECUTIVE FUNCTIONS

The Executive Director of Regeneration and Environment is authorised

to discharge

executive functions for:

1. Community Safety and Street Scene

(a) Community Safety, Resilience and Emergency Planning

(d) Waste and Street Scene

 

Decision:

To approve the implementation of standardised Household Waste Recycling Centre (HWRC) opening hours options of 09:30 to 17:00 throughout the entire year, removing the current

 

seasonal variations. This change will ensure consistency of service delivery and alignment with council policies and operational requirements.

 

Reasons for the Decision:

  • Standardising opening hours ensures full alignment with the Council’s terms and conditions of employment and provides a consistent operational framework.
  • Removing seasonal fluctuations in opening times improves service predictability for residents and staff.
  • The change replaces the previous winter (6 hour) and summer (8.5 hour) schedules with a balanced and equitable year-round model.
  • More consistent and stable working hours support improved staff retention, recruitment, and operational planning.
  • A uniform 09:30 opening time provides better access for residents during periods of highest demand, thereby enhancing the overall customer experience and efficiency of the service.

 

Details of alternative options considered and rejected:

Traffic count data has been reviewed and clearly demonstrates that the busiest period of the day occurs during the morning. As a result, opening earlier provides the greatest benefit to residents and aligns best with service demand.

 

As the objective was to remove seasonal variations in opening hours and better align operational requirements with the Council's standard 37-hour working week, the proposed opening hours of 9:30am to 5:00pm represent the most suitable option and meet all identified requirements.

 

Alternative opening hours were assessed, including comparisons with HWRCs operated by neighbouring authorities, and the continuation of seasonal opening arrangements was also considered. However, none of the alternatives provided the same balance of operational efficiency, customer demand, workforce alignment, and service consistency as the proposed hours of 09:30am to 5pm.

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

N/A

Dispensations Granted:

(If any)

N/A

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

N/A

Dispensations Granted:

(If any)

N/A

Reports or parts of reports relevant to the decision being taken:

 

Briefing (Exempt from public in accordance with Paragraph 3 – Schedule 12a Local Government Act 1972)

Equalities Impact Assessment

Carbon Impact Assessment

 

 

I certify that this is a true record of the executive decision to:

 

Review the Household Waste Recycling Centre opening hours for the above reasons.

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

Dated:          23rd October 2026

 

Name:          Sue Procter                                        

Job Title:     Interim Service Director Community Safety and Street Scene

 

 

 

Wards affected: (All Wards);

Lead officer: Barry Connolly, Joe Haigh


20/10/2026 - Towns and Villages Maltby High Street Public Realm Improvements - Approval of the Full Business Case, completion of procurement, and contract award to commence works ref: 2239    Recommendations Approved

Approval of the Full Business Case detailing final project costs, timeframe and outcomes, allowing contract aware and implementation of the project.

 

Conclude the procurement process and award the works contract to allow commencement on site.

Decision Maker: Executive Director of Regeneration and Environment

Decision published: 26/10/2026

Effective from: 20/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

20th October 2026

Title:

Towns and Villages Maltby High Street Public Realm Improvements – Approval of the Full Business Case and completion of procurement to allow contract award to commence works.

Decision Maker:

(Including Job Title)

Andrew Bramidge, Executive Director of Regeneration and Environment(formerly Strategic Director as stated in Cabinet report December 2024)

 

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

Within the Council’s Constitution, the Executive Director for Regeneration and Environment holds the following delegated powers:

 

Contract Standing Orders – Section 41.2

Each Executive Director has a general power to make Council contracts within their Directorate, including determining select tender lists, accepting tenders and awarding contracts. These powers are subsequently delegated to Assistant Directors through the Sub?Scheme of Delegation.

 

In line with the December 24 Cabinet Report:

 

“Approve the development of thematic interventions described at Section 2 and delegate authority to the Strategic Director for Regeneration and Environment in consultation with the Leader of the Council and the Council’s Section 151 Officer to add, amend or replace a scheme should it become unfeasible or undeliverable”

 

Decision:

  1. Approval of the Full Business Case detailing final project costs, timeframe and outcomes, allowing contract award and implementation of the project delivery.
  2. to conclude the procurement process through approval of the Tender Evaluation Report, thereby authorising the award of the works contract (valued at £535,878.25) under NEC4 and enabling commencement on site.

Reasons for the Decision:

To progress with the delivery of the scheme.

 

Details of alternative options considered and rejected:

Do Nothing:
Leaving Maltby without intervention was rejected because it would fail to address the identified issues around the high street environment and pedestrian experience, and would not deliver the local improvements prioritised through ward member and community engagement.

Reduced?scope scheme:
A smaller scheme was considered but rejected as it would not deliver the quality or extent of improvements required; this is why Cabinet approved additional funding on 7 August 2023 to enable a larger, more comprehensive scheme for Maltby.

 

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

None declared.

Dispensations Granted:

(If any)

N/A

 

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None declared.

Dispensations Granted:

(If any)

N/A

 

Reports or parts of reports considered

-       EXEMPT Maltby High Street Towns and Villages Full Business Case(FBC)

-       EXEMPT Appendix 1 – Business Case Appendices

-       EXEMPT Appendix 2 - 22-167-2b-001 Maltby Public Tender Evaluation Report(TER)

-       Appendix 3 - Maltby Public Realm Equality Impact Assessment Part A

-       Appendix 3 - Maltby Public Realm Equality Impact Assessment Part B

-       Appendix 4 - Maltby Public Realm Climate Impact Assessment

 

I certify that this is a true record of the executive decision to:

 

Approve the Full Business Case for the Maltby High Street Public Realm Improvements Scheme and to award the works contract.

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

 

Dated:          20th October, 2026

 

Name:          Andrew Bramidge           

Job Title:     Executive Director, Regeneration & Environment

 

 

Wards affected: Maltby East;

Lead officer: Melanie Clark


12/10/2026 - Update to the Anti-Money Laundering Policy for minor amendments ref: 2238    Recommendations Approved

To make minor amendments and updates to the Anti-Money Laundering Policy after a bi-annual review.

Decision Maker: Executive Director of Corporate Services

Decision published: 23/10/2026

Effective from: 12/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

12 October 2026

Title:

Update to the Anti-Money Laundering Policy for minor amendments

 

Decision Maker:

(Including Job Title)

Judith Badger, Executive Director Corporate Services

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

Financial Procurement and Procedure Rules

 

Para 23.2 ‘The Chief Finance Officer is responsible for the development and maintenance of an anti-fraud and anti-corruption policy’.

 

Page 25 refers.

Anti money laundering is part of the anti fraud control environment.

 

Decision:

To amend and update the Anti-Money Laundering Policy after a bi-annual review.

Reasons for the Decision:

To maintain the Policy and ensure it is up to date and remains relevant in accurately reflecting the Council’s position with regards to money laundering.

Details of alternative options considered and rejected:

There were no alternative options considered, as this is a bi-annual update to a Policy.  If this was not undertaken there would be a risk that the Policy was not up to date with relevant legislation and current Council arrangements.

 

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

No conflicts of interest.

Dispensations Granted:

(If any)

None

 

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None

Dispensations Granted:

(If any)

None

 

Reports or parts of reports relevant to the decision being taken:

 

The report of the Head of Internal Audit

Anti-Money Laundering Policy review.

Report presented to the Audit Committee on the 24th September 2026, and approved by the Executive Director of Corporate Services.

Final RMBC Anti-Money Laundering Policy 2026 Clean App A.docx

Final AML Report.docx

I certify that this is a true record of the executive decision to:

 

To amend and update the Anti-Money Laundering Policy after a bi-annual review.

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

Dated:          12 October 2026

 

Name:          Judith Badger.                             

Job Title:     Executive Director of Customer Services, S151 Officer

 

 

 

Wards affected: (All Wards);

Lead officer: Louise Ivens


12/10/2026 - Update to the Anti Fraud and Corruption Policy for minor amendments ref: 2237    Recommendations Approved

To make minor amendments and updates to the Anti-Fraud and Corruption Policy after an annual review.

Decision Maker: Executive Director of Corporate Services

Decision published: 23/10/2026

Effective from: 12/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

12 October 2026

Title:

Update to the Anti-Fraud and Corruption Policy for minor amendments

 

Decision Maker:

(Including Job Title)

Judith Badger, Executive Director Corporate Services

Details of Specific Delegation

 

or

 

Delegation contained in the relevant Sub-Scheme of Delegation.

 

Financial Procurement and Procedure Rules

 

Para 23.2 ‘The Chief Finance Officer is responsible for the development and maintenance of an anti-fraud and anti-corruption policy’.

 

Page 25 refers.

 

 

Decision:

To amend and update the Anti-Fraud and Corruption Policy after an annual review.

Reasons for the Decision:

To maintain the Policy and ensure it is up to date and remains relevant in accurately reflecting the Council’s position with regards to fraud and corruption.

Details of alternative options considered and rejected:

There were no alternative options considered, as this is an annual update to a Policy.  If this was not undertaken there would be a risk that the Policy was not up to date with relevant legislation and current Council arrangements.

 

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

No conflicts of interest.

Dispensations Granted:

(If any)

None

 

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None

Dispensations Granted:

(If any)

None

 

Reports or parts of reports relevant to the decision being taken:

 

The report of the Head of Internal Audit

Anti-Fraud and Corruption Policy, Strategy and Self-assessment against Fighting Fraud and Corruption Locally Checklist.

Report presented to the Audit Committee on the 24th September 2026, and approved by the Executive Director of Corporate Services.

Final report Counter fraud framework .docx

 

Anti Fraud and Corruption Policy 2026 Clean App A.docx

I certify that this is a true record of the executive decision to:

 

To amend and update the Anti-Fraud and Corruption Policy after an annual review.

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

 

Dated:          12 October 2026

 

Name:          Judith Badger.                             

Job Title:     Executive Director of Customer Services, S151 Officer

 

 

 

Wards affected: (All Wards);

Lead officer: Louise Ivens


22/10/2026 - Stephenson Way, Lescar Road, Walker Avenue, Waverley, Rotherham - Provision of no waiting at any time restriction ref: 2236    Recommendations Approved

To seek approval from the Director to implement a traffic regulation order.

 

Decision Maker: Executive Director of Regeneration and Environment

Decision published: 23/10/2026

Effective from: 22/10/2026

Decision:

 

ROTHERHAM METROPOLITAN BOROUGH COUNCIL

 

RECORD OF OFFICER EXECUTIVE DECISION

 

Date of Decision:

22nd October 2026

 

Title:

Stephenson Way, Lescar Road and Walker Avenue, Waverley Rotherham.

Provision of no waiting at any time restriction.

Decision Maker:

(Including Job Title)

Simon Moss

Service Director, Planning, Regeneration and Transport 

 

Details of Specific Delegation

or

Delegation contained in the relevant Sub-Scheme of Delegation.

 

To promote, consider objections to and implement Traffic Regulation Orders under the Traffic Regulation Act 1984.

Sub Scheme of Delegation - Strategic Director of Regeneration and Environment.pdf, Page 21.

 

Decision:

The key recommendation of the report is to continue with the making of the orders for the proposal.

Reasons for the Decision:

There is a risk that without providing the proposed waiting restrictions, then vehicles may be parked in a location that affects the sight lines and turning manoeuvres for drivers, with the potential for a collision to occur.

Details of alternative options considered and rejected:

No other options considered. The provision of the waiting restriction is required to ensure the safe and free flow of traffic following construction of the residential development.

Conflicts of interest declared by any Cabinet Member consulted by the decision maker which relates to the decision:

None

Dispensations Granted:

(If any)

None

Conflicts of interest declared by the Decision Maker if they sit as a Cabinet appointed representative to an outside body which relates to the decision:

None

Dispensations Granted:

(If any)

None

Reports or parts of reports considered

Stephenson Way, Lescar Road, Walker Avenue, Waverley Rotherham.

Provision of no waiting at any time restriction.

Appendix A   Provision of existing no waiting at any time restriction. General arrangement drawing

Appendix B   Equalities Assessment

Appendix C   Carbon Impact Assessment

 

 

I certify that this is a true record of the executive decision to:

 

To seek approval to provide a No Waiting at Any Time restriction, on Stephenson Way, Lescar Road, Walker Avenue, Waverley Rotherham to ensure the free and safe flow of traffic along this section of the estate.

 

I confirm that in making this decision, due regard was given to the seven principles of public life.

 

Signed by the Decision Maker:

 

A white paper with a black text AI-generated content may be incorrect.

 

Dated:          22nd October 2026

 

Name:          Simon Moss

Job Title:     Service Director, Planning, Regeneration & Transport

 

 

 

 

Wards affected: Rother Vale;

Lead officer: Nigel Davey